(1) Remove debris such as wooden wedges, skids, hoops and supports.
(2) There should be no debris, flammable, explosive or corrosive chemicals inside and outside the machine.
(3) Check the setting value of the motor overload relay, check whether the electrical wiring meets the requirements of the installation regulations, and the insulation must be grounded to prevent short circuit. The power switch should be placed near the unit.
(4) Refuel the oil and gas tank to the upper line of the oil level gauge.
(5) Switch on the waterway, close the drain valve, and check that the air outlet door is open. The anchor screws of all mechanical and electrical equipment are complete and firm, the protective cover is complete, and the connecting parts and the forbidden firmware are installed normally.
(6) Check that the oil and gas pipeline connection is correct, and the position and status of each valve are correct.
(7) Safety interlocks such as oil pressure, temperature, differential pressure, solenoid valve, over current, under voltage, etc. shall be qualified and debugged according to the provisions of the technical documents of the equipment.
(8) The local control panel and the installed equipment work well, and the indicator light is qualified.