Air compressor commissioning and operation

Mar 29, 2023 Leave a message

1. Commissioning of new machines must be carried out by the commissioning personnel designated or approved by the company;

2. Before starting the machine, confirm that there is no one in the unit, check whether there are left items and tools, and close the unit door; Boot should first inform the crew around the personnel to pay attention to safety;

3. During the test run, strictly check the running direction of the air compressor. When the reversal is found, the machine should be shut down immediately, cut off the power supply, switch any two roots of the three-phase line and restart the machine, otherwise it will damage the air compressor (pay attention to every time the factory power supply maintenance!). ;

4. The air compressor can not work under the exhaust pressure higher than that specified on the nameplate, otherwise it will lead to motor overload and burn out;

5. When the air compressor is in remote control, the machine may start at any time, should be listed to remind;

6. When the air compressor fails or there are unsafe factors, do not force the machine to start, at this time, the power should be cut off and marked.